Continued work on torque tube

Cut out opening in the the torque for the control stick, then welded in the control stick housing and the elevator idler bracket. Afterward I drilled the holes in the control stick housing per the plans. Lastly I welded the aileron pushrod tabs onto the torque tube.

Design pdevty